Testing and commissioning of electrical substations

At Inove, once the construction and assembly phase of an electrical substation has been completed, we check that everything is correctly assembled before its final connection to the grid.

To this end, we carry out commissioning tests, verifying and checking the wiring, the load of the protection settings, the operating logics and the primary and secondary injection.